Yusoff, N. and Ramasamy, M. (2009) Integrated scheduling and RTO of RGP with MPC and PI controllers. Journal of Applied Sciences, 9 (17). pp. 3027-3033. ISSN 18125654
Full text not available from this repository.Abstract
This study proposes an integrated framework of scheduling and Real-Time Optimization (RTO) of a Refrigerated Gas Plant (RGP). At the top layer, a high fidelity dynamic model of RGP is subjected to scheduling of plant operating mode from natural gas liquids to sales gas and vice-versa. Set points from mode scheduling are passed down to the steady-state RTO layer. Modeling mismatch is minimized by rigorously exchanging values of key variables between dynamic and steady-state models. Optimal trajectories of set points are obtained using sequential quadratic programming algorithm with constraints. These trajectories are disjointedly implemented by Model Predictive Control (MPC) scheme and Proportional-Integral (PI) controllers for comparison. Four case studies for each mode scheduling are performed to illustrate efficacy of the proposed approach.
Item Type: | Article |
---|---|
Additional Information: | cited By 0 |
Uncontrolled Keywords: | Integrated frameworks; Integrated scheduling; Natural gas liquids; Optimal trajectories; Proportional integral controllers; Real-time optimization; Sequential quadratic programming algorithm; Steady-state models, Gas plants; Model predictive control; Optimization; Predictive control systems, Scheduling |
Depositing User: | Mr Ahmad Suhairi UTP |
Date Deposited: | 09 Nov 2023 15:48 |
Last Modified: | 09 Nov 2023 15:48 |
URI: | https://khub.utp.edu.my/scholars/id/eprint/711 |