Abba, H.A. and Zakaria, N. and Shah, S.N.M. and Pal, A.J. (2012) Design, development and performance analysis of deadline based priority heuristic for job scheduling on a grid. In: UNSPECIFIED.
Full text not available from this repository.Abstract
A grid is a large-scale, heterogeneous, dynamic collection of independent computers, geographically distributed and interconnected with high speed networks. The resources making up a grid need to be managed to provide a good quality of service. Grid scheduling is a vital component of a Computational Grid infrastructure. Typically scheduling challenges tend to be NP-hard problems where there is no optimal solution. Here we are proposing a modified prioritized deadline based scheduling algorithm (MPDSA) using project management techniques for efficient job execution with deadline constraints of users jobs. An extensive performance comparison has been presented using synthetic workload traces to evaluate the efficiency and robustness of grid scheduling with respect to average turnaround time, average waiting time and maximum tardiness. The result has shown improved performance under dynamic scheduling environment. Based on the comparative performance analysis, proposed MPDSA has shown the optimal performance as compared to PDSA, FCFS and RR scheduling algorithms under dynamic scheduling environment. © 2012 Elsevier B.V.
Item Type: | Conference or Workshop Item (UNSPECIFIED) |
---|---|
Additional Information: | cited By 5; Conference of 2012 International Conference on Advances Science and Contemporary Engineering, ICASCE 2012 ; Conference Date: 24 October 2012 Through 25 October 2012 |
Depositing User: | Mr Ahmad Suhairi UTP |
Date Deposited: | 09 Nov 2023 15:50 |
Last Modified: | 09 Nov 2023 15:50 |
URI: | https://khub.utp.edu.my/scholars/id/eprint/2414 |