Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)

Alaloul, W.S. and Heng, L.J. and Qureshi, A.H. (2023) Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS). Arabian Journal for Science and Engineering, 48 (10). pp. 13377-13393. ISSN 2193567X

Full text not available from this repository.
Official URL: https://www.scopus.com/inward/record.uri?eid=2-s2....

Abstract

The industrialized building system (IBS) is a modern technology that may advance the construction industry. In various domains, conventional construction methodologies are being replaced by IBS to meet growing market demand sustainably. The Malaysian government has successfully started implementing IBS in the public sector. However, the private sector is hesitant about its adoption. Last planner system (LPS) is a realistic way to collaboratively manage project-based production that involves trade foremen or design team leaders (the last planners) in planning in greater and greater detail as the time for the work to be done gets closer. This study identified the critical success factors (CSFs) of IBS adoption using a questionnaire survey distributed among the IBS stakeholders, contractors, consultants and academicians. After that, a conceptual framework was developed for adopting IBS in Malaysia based on the LPS via analytical hierarchy process. The results display the importance level of each CSFs by their criteria weight according to master planning, phase planning, make-ready planning, weekly planning and learning phase in LPS. © 2023, King Fahd University of Petroleum & Minerals.

Item Type: Article
Additional Information: cited By 0
Depositing User: Mr Ahmad Suhairi UTP
Date Deposited: 04 Jun 2024 14:10
Last Modified: 04 Jun 2024 14:10
URI: https://khub.utp.edu.my/scholars/id/eprint/18198

Actions (login required)

View Item
View Item