Integrated scheduling and RTO of RGP with MPC and PI controllers

Yusoff, N. and Ramasamy, M. (2009) Integrated scheduling and RTO of RGP with MPC and PI controllers. Journal of Applied Sciences, 9 (17). pp. 3027-3033. ISSN 18125654

Full text not available from this repository.
Official URL: https://www.scopus.com/inward/record.uri?eid=2-s2....

Abstract

This study proposes an integrated framework of scheduling and Real-Time Optimization (RTO) of a Refrigerated Gas Plant (RGP). At the top layer, a high fidelity dynamic model of RGP is subjected to scheduling of plant operating mode from natural gas liquids to sales gas and vice-versa. Set points from mode scheduling are passed down to the steady-state RTO layer. Modeling mismatch is minimized by rigorously exchanging values of key variables between dynamic and steady-state models. Optimal trajectories of set points are obtained using sequential quadratic programming algorithm with constraints. These trajectories are disjointedly implemented by Model Predictive Control (MPC) scheme and Proportional-Integral (PI) controllers for comparison. Four case studies for each mode scheduling are performed to illustrate efficacy of the proposed approach.

Item Type: Article
Additional Information: cited By 0
Uncontrolled Keywords: Integrated frameworks; Integrated scheduling; Natural gas liquids; Optimal trajectories; Proportional integral controllers; Real-time optimization; Sequential quadratic programming algorithm; Steady-state models, Gas plants; Model predictive control; Optimization; Predictive control systems, Scheduling
Depositing User: Mr Ahmad Suhairi UTP
Date Deposited: 09 Nov 2023 15:48
Last Modified: 09 Nov 2023 15:48
URI: https://khub.utp.edu.my/scholars/id/eprint/711

Actions (login required)

View Item
View Item