TY - CONF VL - 2017-D AV - none PB - IEEE Computer Society SP - 669 EP - 673 ID - scholars8546 N1 - cited By 4; Conference of 2017 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2017 ; Conference Date: 10 December 2017 Through 13 December 2017; Conference Code:134633 UR - https://www.scopus.com/inward/record.uri?eid=2-s2.0-85045268724&doi=10.1109%2fIEEM.2017.8289975&partnerID=40&md5=bf514ad6c7ebc1bb0a5ca9ecc41f65a8 A1 - Che-Ani, M.N. A1 - Kamaruddin, S. A1 - Azid, I.A. TI - Towards just-in-time (JIT) production system through enhancing part preparation process KW - Manufacture; Production efficiency KW - Just-in-time; Just-in-time production systems; Manufacturing plant; Part preparation; Plan do check acts; Plan-do-check-act; Preparation process; Production process; Waiting time KW - Just in time production Y1 - 2017/// SN - 21573611 N2 - In this paper the improvement activity in manufacturing plant has been conducted by focusing outside of production process which is part preparation activity in warehouse area. The Plan-Do-Check-Act (PDCA) cycle has been adopted to identify, analyze, verify and implement the improvement activity with the purpose of creating better management of the part preparation activity. To ensure the successful adaptation of PDCA cycle, a small group consisting of cross-functional team members has been formed to analyze and solve the issue. The ultimate objective is to ensure the process improvement will optimize the efficiency of production systems and achieving the Just-in-Time (JIT) concept. Based on the investigation and implementation of the case study industry, the result shows a successful adaptation of PDCA cycle outside of the production process. The waiting time of the production due to misaligned time of the pre-preparation part had been identified as a root cause and successfully eliminated. © 2017 IEEE. ER -