%0 Conference Paper
%A Harahap, I.S.H.
%A Fai, L.C.
%D 2016
%F scholars:7534
%I CRC Press/Balkema
%K Environmental engineering; Offshore oil well production, Case pile wave analysis programs; Driven pile; Expansion projects; Pile capacity; Remedial work; United Arab Emirates, Piles
%P 345-350
%R 10.1201/b21942-69
%T Pile set up investigation for improvement on pile capacity
%U https://khub.utp.edu.my/scholars/7534/
%X Driven pile capacity often increases over time and this is known as pile set-up. This study is to investigate the pile set-up based on the data obtained from the expansion project in United Arab Emirate. A significant number of piles at the project fall below the required pile capacity. Instead of performing pile remedial work, the effect of pile set-up is then quantified. To evaluate pile set-up, selected piles are re-stroked and evaluated using Case Pile Wave Analysis Program (CAPWAP). The elapsed time for re-strike varied from 4 to 71 days and the mobilized capacity increased varying from 65 to 280 tons. The results are then compared with established correlation and the highest percentage difference is 25. Overall pile set-up is estimated from the correlation and 40 increment is adopted. The results show that the percentage of failed piles after incorporating set-up reduced from 35.9 to 10.3. © 2016 Taylor & Francis Group, London.
%Z cited By 0; Conference of 3rd International Conference on Civil, offshore and Environmental Engineering, ICCOEE 2016 ; Conference Date: 15 August 2016 Through 17 August 2016; Conference Code:180169