eprintid: 6313 rev_number: 2 eprint_status: archive userid: 1 dir: disk0/00/00/63/13 datestamp: 2023-11-09 16:18:05 lastmod: 2023-11-09 16:18:05 status_changed: 2023-11-09 16:05:38 type: article metadata_visibility: show creators_name: Umar, U.A. creators_name: Shafiq, N. creators_name: Malakahmad, A. creators_name: Nuruddin, M.F. creators_name: Khamidi, M.F. creators_name: Farhan, S.A. creators_name: Gardezi, S.S.S. title: 4D BIM application in AEC industry: Impact on integrated project delivery ispublished: pub note: cited By 16 abstract: As project delivery approaches that are supported by Building Information Modelling (BIM) are continuously acknowledged throughout the Architecture, Engineering and Construction (AEC) industry, an innovative modelling approach called 4D BIM is starting to develop, which associates elements of 3D BIM with time and scheduling information. Traditional construction planning applications like bar charts and network diagrams fail to present and communicate the spatial and temporal or 4D components of construction schedules efficiently. As a result, they do not permit project managers to produce scheduling alternatives quickly to obtain the finest solution to develop a particular design. With 4D modelling, the whole period of a sequence of activities that is executed by those involved in the project can be presented visually. With the rising interest in BIM and the wider use of this and other technological innovations in the AEC industry, 4D BIM tools, which has been broadly employed, is becoming increasingly recognized among fundamental technological fields under BIM. This study aims to highlight and review numerous impacts of 4D applications on Integrated Project Delivery (IPD) on the AEC industry and suggest the ideal strategy to optimize the tools for rapid project delivery. © 2015, Maxwell Scientific Organization. date: 2015 publisher: Maxwell Science Publications official_url: https://www.scopus.com/inward/record.uri?eid=2-s2.0-84937041893&doi=10.19026%2frjaset.10.2462&partnerID=40&md5=e7c2a49b44c4661671d4ac20d7d4e6a3 id_number: 10.19026/rjaset.10.2462 full_text_status: none publication: Research Journal of Applied Sciences, Engineering and Technology volume: 10 number: 5 pagerange: 547-552 refereed: TRUE issn: 20407459 citation: Umar, U.A. and Shafiq, N. and Malakahmad, A. and Nuruddin, M.F. and Khamidi, M.F. and Farhan, S.A. and Gardezi, S.S.S. (2015) 4D BIM application in AEC industry: Impact on integrated project delivery. Research Journal of Applied Sciences, Engineering and Technology, 10 (5). pp. 547-552. ISSN 20407459