TY - CONF AV - none ID - scholars5623 TI - Design of cement plant waste heat recovery generation KW - Cement plants; Cements; Cost estimating; Design; Heat transfer; Models; Steam power plants; Waste heat KW - Construction stages; Cost estimations; Dynamic process simulation; Engineering design; Heat recovery unit; Operation unit; Pinch analysis; Steady state KW - Waste heat utilization N2 - Waste heat in cement plant is a huge waste heat from kiln and raw mill plant. Such as ordinary power plant, waste heat recovery generation consist of various operation units ie., economizer, evaporator, super heater, steam drum, and turbine. In order to obtain the optimal heat recovery, proper operation units should be designed and arranged optimally. This paper describes heat recovery unit operations modelling using Aspen HYSYS software. Hysys can be utilized as single tool for design and simulate WHRG system. The steady-state and dynamic process simulation, simulate pinch analysis result, area of heat transfer and roughly cost-estimation could be provided using this tool. The results show the Aspen HYSYS model could provide satisfied engineering design data that could be used in construction stage. © 2015 IEEE. N1 - cited By 4; Conference of 25th Australasian Universities Power Engineering Conference, AUPEC 2015 ; Conference Date: 27 September 2015 Through 30 September 2015; Conference Code:118592 PB - Institute of Electrical and Electronics Engineers Inc. SN - 9781479987252 Y1 - 2015/// A1 - Bayuaji, R. A1 - Biyanto, T.R. A1 - Irawan, S. UR - https://www.scopus.com/inward/record.uri?eid=2-s2.0-84962393595&doi=10.1109%2fAUPEC.2015.7324816&partnerID=40&md5=89f681685c97b05ef3a2e723036a7fed ER -