%O cited By 0; Conference of 3rd International Conference on Process Engineering and Advanced Materials, ICPEAM 2014 ; Conference Date: 3 June 2014 Through 5 June 2014; Conference Code:114811 %L scholars4679 %J Applied Mechanics and Materials %D 2014 %R 10.4028/www.scientific.net/AMM.625.390 %X This work deals with an integrated decision at the refinery scheduling and operational optimization levels. Re-scheduling is performed as a means to integrate both of these levels. Results indicate that the total benefit obtained by the proposed integrated method managed to increase 16 of the base case profit. © 2014 Trans Tech Publications, Switzerland. %K Refining, Integrated decision; Integrated frameworks; Integrated method; Operational optimization; Re-scheduling; Refinery scheduling; Total benefits, Scheduling %P 390-393 %T An integrated framework for refinery scheduling and operational optimization %I Trans Tech Publications Ltd %V 625 %A K.M. Siraj %A N. Yusoff %A M. Shuhaimi %A S.F. Ali