%P 2136-2141 %A A. Shafeeq %A M.I.A. Mutalib %A K.A. Amminudin %A A. Muhammad %V 8 %T Scheduling three stage flowshop processes with no intermediate storage using novel matrix approach %L scholars457 %J Journal of Applied Sciences %O cited By 1 %R 10.3923/jas.2008.2136.2141 %N 11 %D 2008 %K Batch process; Matrix formulation; Minimizing makespan; No intermediate storages; Optimal sequence; Production sequences; Scheduling optimization; Transfer policies, Batch data processing; Matrix algebra; Optimization; Production engineering; Scheduling algorithms, Scheduling %X Scheduling optimization normally aimed at minimizing makespan, leading to overall optimization of the production cost. This study focuses on determining the production sequence with minimum makespan for scheduling of a flowshop process using no intermediate storage (NIS) transfer policy. Unlike previous methods which uses mathematics considerably and lacks interactivity, the method introduces a simple approach based on matrix formulation to determine the makespan for all possible batch production sequences thus allowing simple screening to be done for selecting the optimal sequence. © 2008 Asian Network for Scientific Information.