TY - JOUR AV - none TI - Competence-oriented decision model for optimizing the operation of a cascading hydroelectric power reservoir SP - 1895 N1 - cited By 1 SN - 20407459 PB - Maxwell Science Publications EP - 1901 ID - scholars3977 N2 - The operation of the four Perak cascading reservoirs namely, Temenggor, Bersia, Kenering and Chenderoh analyzed using the newly developed genetic algorithm model. The reservoirs are located in the state of Perak of Peninsular Malaysia that used for hydroelectric power generation and flood mitigation. The hydroelectric potential of the cascading scheme is 578 MW. However, the actual annual average generation was 228 MW, which is about 39 of the potential. The research aimed to improve the annual average hydroelectric power generation. The result of the fitness value used to select the optimal option from the test of eight model runs options. After repeated runs of the optimal option, the best model parameters are found. Therefore, optimality achieved at population size of 150, crossover probability of 0.75 and generation number of 60. The operation of GA model produced an additional of 12.17 MW per day. The additional power is found with the same total annual volume of release and similar natural inflow pattern. The additional hydroelectric power can worth over 22 million Ringgit Malaysia per year. In addition, it plays a significant role on the growing energy needs of the country . © Maxwell Scientific Organization, 2013. IS - 10 Y1 - 2013/// VL - 6 UR - https://www.scopus.com/inward/record.uri?eid=2-s2.0-84880689659&doi=10.19026%2frjaset.6.3921&partnerID=40&md5=30b24f54a9279585ef5e8f9ffdaeb64b A1 - Asfaw, T.D. A1 - Yusof, K.W. A1 - Hashim, A.M. JF - Research Journal of Applied Sciences, Engineering and Technology ER -