TY - JOUR Y1 - 2008/// UR - https://www.scopus.com/inward/record.uri?eid=2-s2.0-79957458722&doi=10.1007%2f978-0-387-74905-1_11&partnerID=40&md5=a4cb97110859faf373c8f9d609bbc230 JF - Lecture Notes in Electrical Engineering A1 - Shafeeq, A. A1 - Mutalib, M.I.A. A1 - Amminudin, K.A. A1 - Muhammad, A. VL - 5 LNEE CY - Hong Kong N2 - Scheduling zero-wait batch processes involves various parameters of which makespan is normally used as the deciding parameter for selecting the optimum production sequence. Most of the currently available methods for determining makespan are based on complex mathematical programming techniques. The current research focuses on developing a novel method to determine makespan for zero-wait batch processes using simple mathematics coupled with some rule-based guidelines to be performed on a matrix containing the batch process recipes. The method is reasonably efficient and gives promising results with different batch process recipes. © 2008 Springer Science+Business Media, LLC. KW - Batch process; Makespan; matrix; Matrix approach; Multi-products; Novel methods; Production sequences; Rule based; zero wait KW - Batch data processing; Mathematical programming; Mathematical techniques; Scheduling KW - Scheduling algorithms ID - scholars359 SN - 18761100 EP - 153 AV - none N1 - cited By 0; Conference of International Multi-Conference of Engineers and Computer Scientists, IMECS 2007 ; Conference Date: 21 March 2007 Through 23 March 2007; Conference Code:84947 SP - 143 TI - A novel matrix approach to determine makespan for zero-wait batch processes ER -