eprintid: 177 rev_number: 2 eprint_status: archive userid: 1 dir: disk0/00/00/01/77 datestamp: 2023-11-09 15:15:49 lastmod: 2023-11-09 15:15:49 status_changed: 2023-11-09 15:13:29 type: conference_item metadata_visibility: show creators_name: Nallagownden, P. creators_name: Fauzi, A.A. title: Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project) ispublished: pub keywords: Drilling platforms; Electric loads; Electric power systems; Electric power transmission networks; Flow simulation; Graphical user interfaces; Mathematical models; Modernization; Offshore structures; Phase interfaces; Power transformers; Power transmission; System stability; Welds, Case studies; Development projects; Distribution equipments; Electrical power systems; Equipment selections; ERACS 1; Generating units; Load flow study; Load flows; Mathematical representations; Modelling and simulations; Off shore platforms; Power system analyses; Power systems; Sample analysis; Short circuit study; Simulation processes; System requirements; System upgrades; Transmission lines, Electric network analysis note: cited By 0; Conference of 2007 International Conference on Intelligent and Advanced Systems, ICIAS 2007 ; Conference Date: 25 November 2007 Through 28 November 2007; Conference Code:74506 abstract: A power system analysis determines whether the proposed system upgrades, future upgrades and present distribution equipment will meet the present and future system requirements. This project involves two major parts, namely modelling and simulation for the purpose of load flow and short circuit studies. Modelling here refers to the mathematical representation of various components of a power system such as generating units, transmission lines, buses, transformers, loads, machines, etc. While simulation is required to establish the actual situation on the platform and how it will run based on different scenarios. ERACS has been extensively used in this project as it helps to improve the simulation process by increasing the speed of simulation and has a powerful graphical user interface. SUMANDAK Phase 2 (SUPG-B) Platform is chosen as a case study for sample analysis. The main objective of the project is to determine the performance of an electrical power system for an offshore platform and to validate its precision, based on the system stability and equipment selection of an actual project. ©2007 IEEE. date: 2007 official_url: https://www.scopus.com/inward/record.uri?eid=2-s2.0-57949098354&doi=10.1109%2fICIAS.2007.4658506&partnerID=40&md5=40a0fbabfe50f691a9fea4bd95ee1643 id_number: 10.1109/ICIAS.2007.4658506 full_text_status: none publication: 2007 International Conference on Intelligent and Advanced Systems, ICIAS 2007 place_of_pub: Kuala Lumpur pagerange: 845-850 refereed: TRUE isbn: 1424413559; 9781424413553 citation: Nallagownden, P. and Fauzi, A.A. (2007) Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project). In: UNSPECIFIED.