eprintid: 15886 rev_number: 2 eprint_status: archive userid: 1 dir: disk0/00/01/58/86 datestamp: 2023-11-10 03:30:31 lastmod: 2023-11-10 03:30:31 status_changed: 2023-11-10 02:00:39 type: article metadata_visibility: show creators_name: Azhari, N.A. creators_name: Mohamad, H. title: Greenfield settlement of kvmrt ssp line 2 in kuala lumpur limestone formation ispublished: pub keywords: Lime; Limestone; Offshore oil well production; Rapid transit; Tunneling (excavation), Ground excavation; Ground settlement; Instrument monitoring; Limestone formation; Mass rapid transit; Settlement troughs; Transportation infrastructures; Underground space, Motion estimation note: cited By 0; Conference of 6th International Conference on Civil, Offshore and Environmental Engineering, ICCOEE 2020 ; Conference Date: 13 July 2021 Through 15 July 2021; Conference Code:253689 abstract: Significant growth have been achieved in many major cities around the world. The demand of better connectivity through various transportation infrastructure has led to ever more reliance to underground space such as tunnels. Hence engineering-wise, a more reliable design reference will provide better ground movement estimation from the ground excavation. The instrument monitoring data for the Klang Valley Mass Rapid Transit (KVMRT-SSP) Line 2, Malaysia in Kuala Lumpur Limestone formation is presented in this paper to assess the magnitude of ground movement during tunnelling works. Back calculation of settlement trough width parameter, K and volume loss, VL are presented in this paper. Based on 13 arrays of ground settlement markers (GSM) records, the averaged back-calculated K is 0.9 whereas VL ranges from 0.16 to 0.21. The information is useful for future tunnelling especially of similar ground characteristics in estimation of ground movement. © The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd. 2021. date: 2021 publisher: Springer Science and Business Media Deutschland GmbH official_url: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85100797675&doi=10.1007%2f978-981-33-6311-3_116&partnerID=40&md5=45afa82057cdf01066161630042afe5f id_number: 10.1007/978-981-33-6311-3₁₁₆ full_text_status: none publication: Lecture Notes in Civil Engineering volume: 132 pagerange: 1027-1034 refereed: TRUE isbn: 9789813363106 issn: 23662557 citation: Azhari, N.A. and Mohamad, H. (2021) Greenfield settlement of kvmrt ssp line 2 in kuala lumpur limestone formation. Lecture Notes in Civil Engineering, 132. pp. 1027-1034. ISSN 23662557