Competence-oriented decision model for optimizing the operation of a cascading hydroelectric power reservoir

Asfaw, T.D. and Yusof, K.W. and Hashim, A.M. (2013) Competence-oriented decision model for optimizing the operation of a cascading hydroelectric power reservoir. Research Journal of Applied Sciences, Engineering and Technology, 6 (10). pp. 1895-1901. ISSN 20407459

Full text not available from this repository.
Official URL: https://www.scopus.com/inward/record.uri?eid=2-s2....

Abstract

The operation of the four Perak cascading reservoirs namely, Temenggor, Bersia, Kenering and Chenderoh analyzed using the newly developed genetic algorithm model. The reservoirs are located in the state of Perak of Peninsular Malaysia that used for hydroelectric power generation and flood mitigation. The hydroelectric potential of the cascading scheme is 578 MW. However, the actual annual average generation was 228 MW, which is about 39 of the potential. The research aimed to improve the annual average hydroelectric power generation. The result of the fitness value used to select the optimal option from the test of eight model runs options. After repeated runs of the optimal option, the best model parameters are found. Therefore, optimality achieved at population size of 150, crossover probability of 0.75 and generation number of 60. The operation of GA model produced an additional of 12.17 MW per day. The additional power is found with the same total annual volume of release and similar natural inflow pattern. The additional hydroelectric power can worth over 22 million Ringgit Malaysia per year. In addition, it plays a significant role on the growing energy needs of the country . © Maxwell Scientific Organization, 2013.

Item Type: Article
Additional Information: cited By 1
Depositing User: Mr Ahmad Suhairi UTP
Date Deposited: 09 Nov 2023 15:52
Last Modified: 09 Nov 2023 15:52
URI: https://khub.utp.edu.my/scholars/id/eprint/3977

Actions (login required)

View Item
View Item